Appearance
spdd-prompt-update
spdd-prompt-update updates an existing prompt artifact after requirements, design assumptions, or architecture constraints have changed.
Quick start
text
Use the spdd-prompt-update skill on @spdd/prompt/PROMPT-001.md.Include a description of what changed in the request.
Use it when
- the prompt still exists but the problem definition changed
- you want to preserve the existing prompt structure instead of regenerating from scratch
- requirement or design constraints shifted after the prompt was originally written
Output
This phase produces:
- an updated prompt under
spdd/prompt/ - a phase result block recommending
spdd-generateas the next phase
Role in the workflow
(requirement changes)
└─ spdd-prompt-update → spdd/prompt/ → spdd-generateBusiness intent changed first?
Use spdd-prompt-update when the change originated in requirements or design. If instead the implementation changed first (refactor, drift), use spdd-sync instead.
Review gate
In semi-auto mode, the orchestrator stops after spdd-prompt-update for review before continuing to spdd-generate.